  1. The first call

    Day 1

    You tell us the street, the yard and what is wrong with it. A photo helps. We tell you roughly what kind of job it is and whether we can take it this season.

  2. Site visit and measure

    At a time that suits you

    Daniel comes to the house, measures the yard, shoots the grade from the foundation out, checks the trees against your town's bylaw and looks at where the water goes.

  3. Design and drawing

    After the visit

    A measured drawing with levels, materials and planting, and a written quote priced line by line, base depth included. For a full backyard, the design fee is credited to the build.

  4. Written contract and deposit

    When you are ready

    Ontario requires a written contract for home renovation work over $50, and the final price cannot exceed the estimate by more than 10 percent without a signed change. If you sign at home, you have a 10-day cooling-off period. Ministry guidance recommends deposits of no more than 10 percent of the total, and we follow it.

  5. The locate

    5 business days before the dig

    We request the Ontario Dig Authority locate, which is free and required before any dig. Private lines such as irrigation, pool wiring or a barbecue gas line need a private locate, which we book too.

  6. The build

    Start week set in the contract

    Drainage, base, stone, walls, planting, sod and lights, in that order, with Daniel on site daily. A residential paver job runs several days to roughly two weeks; a full backyard takes longer.

  7. The walkthrough

    The last day of the build

    We walk the finished yard with you, test the lights after dark, hand over the watering plan and the warranty in writing, and take final payment.

  8. The one-year check

    About a year after the walkthrough

    We come back, look at every joint and every plant, and replace anything that failed in the first year, once.